Affichage de 91952 résultats

Archival description
Aperçu avant impression Affichage :

37913 résultats avec objets numériques Afficher les résultats avec des objets numériques

University Hospital - Front View

Front view of the University Hospital's main entrance. Summer scene.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948 and 1955 by Smith Bros. and Wilson, contractors, at a cost of $7,000,000.00, the 6-storey, 7-wing University Hospital was officially opened by Bentley, T.J., Saskatchewan Minister of Health on May 1955. The name was officially changed to Royal University Hospital 23 May 1990.

University Hospital near completion

View of the University Hospital with unfinished landscaping but roadways and sidewalks are completed. Unidentified people walking.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948 and 1955 by Smith Bros. and Wilson, contractors, at a cost of $7,000,000.00, the 6-storey, 7-wing University Hospital was officially opened by Bentley, T.J., Saskatchewan Minister of Health on May 1955. The name was officially changed to Royal University Hospital 23 May 1990.

University Hospital - Addition - Interior

People sitting and walking in foreground with east entrance of University Hospital addition in background.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948-1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health, on 14 May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

University Hospital - Opening Ceremony

View of large crowd [4000] attending at outdoor ceremonies for the opening of the University Hospital. The Little Stone Schoolhouse and College Drive are visible in the background.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948 and 1955 by Smith Bros. and Wilson, contractors, at a cost of $7,000,000.00, the 6-storey, 7-wing University Hospital was officially opened by Bentley, T.J., Saskatchewan Minister of Health on May 1955.The name was officially changed to Royal University Hospital 23 May 1990.

Résultats 8086 à 8100 sur 91952